As a leading supplier in the low voltage electrics industry, Shanghai Newtrend Electric Co., Ltd. products have been used for residential, commercial and industrial applications with its quality and service. Newtrend brand is recognized for its quality and reliability in an ever-increasing number of markets worldwide. So far Newtrend products have gained many international approvals, such as UL, TUV, KEMA, CB, SEMKO, RoHS, CE, and CCC etc.
With quality raw materials and components supply, all products are manufactured to Newtrend's defined specifications. We have 4 semi-auto production lines, up to date quality control facilities, and well-trained skillful workers. Moreover, with a technical R & D team and fully equipped in-house laboratory,
NewTrend have wide range cooperations with world leading companies in new products developing or OEM, ODM cooperation. Meanwhile we also process industry cooperation on intelligent home products, and work with some university such as Xi'an Jiao Tong University on project solutions. NewTrend is focused on achieving growth through the growth and success of its worldwide partners.
Enterprise Culture
Whole industry chain household paper manufacturing enterprisesxample
Core Ideas
Win-win, win-win
Enterprise Purpose
Tree trusted brand, create good quality
Team Concept
Cooperation and mutual assistance, dedication
Business Sales Concept
People-oriented, scientific and technological innovation
Installation Instruction Manual
Warmly welcome new and old partners to visit and negotiate, and sincerely invite agents in the same industry to operate light assets in local factories! Willing to work with the majority of partners to win-win, winning!

Installation steps 1
The bottom frame is connected to the bottom beam and bottom side beam with screws, and the 8*4 square tube x 9 is connected with screws

Installation steps 2
The bottom frame is connected to the bottom beam and bottom side beam with screws, and the 8*4 square tube x 9 is connected with screws

Installation Step 3
Measuring verticality of column with line drop and level

Installation Step 4
The top frame is connected to the top beam and the top side beam with screws, and the drain hole faces outward.


Installation Step 6
Install three horizontal square pipes and fix them at the welding angle of the top short beam.





Installation Step 11
The edge of the ceiling tile shall be hammered with rubber to seal and glue around. It is strictly prohibited to directly trample on the single roof tile during construction. It is necessary to prepare two square pipes to assist construction before stepping on the square pipe.

Installation Step 12
Installation of cement pressure plate surface with 1.6 plastic floor. Evenly laid.

Installation Step 13
Installation of wall panels and doors and windows